Recently I’ve been talking with a distributor about how long a retrofit will take to go from a tammermatic machine to a Washworld razor machine and they said it’s 1-2 days for disassembly and 5-9 days for install and they are usually waiting on the trades like plumber and electrician if needed. I was wondering how long actual retrofits take for other places and if this sounds too good to be true