Big Chris
Member
So after a couple weeks of playing with my hot melt crack sealer score from Facebook Marketplace. Cutting out some decaying sections and patching with Aquaphalt. and the promise of 2 days without rain. The local crew is on site seal coating. We'll be closed today (Mon 7/21 & Tues 7/22). I really think this along with last summer's paint job and new signage this should make the place "pop". Guys went through almost 35 gallons of the stuff that goes down first to hide oil stains from all the tire shine.
A little before and after. I'll grab a drone shot later this afternoon.


A little before and after. I'll grab a drone shot later this afternoon.

