I just ordered my Takagi on-demand heater for my low pressure pre-soak passes in the Razor and gave myself the old forehead smack when I realized that I have to run roughly 50' of gas line up and overhead to get to where the heater is going to be installed. I know local and state codes will vary, but is this an acceptable method for feeding my new heater? Does anyone have experience with it and has it ever been an issue with the inspector?
Thanks in advance.
John