Thanks Zal. I got a 4' concrete walkway in front of the bays with floor heat. To extend the bay, I thought I'll have to break it down to make the foundation for the new wall. If I break it down, I think most likely I'll damage the pex.
Overachiever, thanks for your input. $50-60K was real...