Thanks guys, I'll check those two out and talk with our vendors. Appreciate it.
The soil issue is structural - our construction bid has a line item for "Grading: Topsoil Strip & Respread, Cut-to-Fill, Building Excavation & Backfill, Site Subgrade, Pond Excavation & Infiltration Soil".