This is a sample guest message. Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!
How many inches would you leave between foam brush/triple foam units and ceiling? I want to get them as high as possible but still leave room if I have to work on it.
After a while wall space becomes premium real estate inside an equipment room. I recently saw someone run unistrut out from the wall 90 degrees and mount solenoid banks, etc. on it. Not a bad idea.
After a while wall space becomes premium real estate inside an equipment room. I recently saw someone run unistrut out from the wall 90 degrees and mount solenoid banks, etc. on it. Not a bad idea.
Can you imagine having some large disconnect for everything on a solenoid board so you could just unplug it and pull it out like a card in a PC? Sure would make servicing easier, and you could have a spare to swap out.
Can you imagine having some large disconnect for everything on a solenoid board so you could just unplug it and pull it out like a card in a PC? Sure would make servicing easier, and you could have a spare to swap out.
That would be sweet. I would just settle for a "plug and play" solenoid valve. Those single manifold blocks of solenoids are compact and nice but if you need to repair/replace one you must shut down everything and then it is not always a picnic to remove/replace the valve.