Kar B Kleen
Member
Stumbled on a "Tom's Way" video on Kleen Rite site about plumbing a low pressure system. He's saying to tee the 1/4" poly tubing (air and product) together in the equipment room and run 1/2" Polybraid to the bay, with no foam generator needed. I've always ran 1/4" poly tube to bay and tee together in the bay with a homemade foam generator. Thoughts pro/con on doing it Tom's way. I'm remodeling and would like to hear comments on doing it this way. Would 3/8" polybraid not work as good as 1/2"? Would it also work as well on 3X foam? Thanks in advance.