We have a PDQ 360 Plus IBA and I'm looking at tweaking the settings to get the most out of our soaps and machine in order to put through the most amount of vehicles/hr.
Anyone out there with the same machine willing to share their packages? Right now we have 4 packages.
The times are:
3:21 - Lowest package
3:27 - Second package
4:37 - Third package
5:04 - Top Package
Anyone out there with the same machine willing to share their packages? Right now we have 4 packages.
The times are:
3:21 - Lowest package
3:27 - Second package
4:37 - Third package
5:04 - Top Package